Picture of front of building is taken from the water's edge, building faces away from street for more privacy, onto cove, with swimming pool in sunny spot in picture.
Some of the 25-20 foot Ferro-cement columns sunk to bedrock
Crane lowering columns,18 feet down to bedrock,
Some of the tons of materials needed to create foundation.
12 ft. by 84 ft by 3 ft. concrete/steel water storage cistern
20,000 gallon water storage cistern,
floor poured, forming walls
Pouring concrete day and night, we are serious about timely completion
Early stage of layout, organization
Jobsite from seaside perspective
Completed slad over cystern and structure, 18 feet to bedrock
One of the three dwellings originally on property
Another of the buildings that had to be removed